Pricing, Honestly

No mystery math. Here's how the number gets built.

There is no responsible universal per-square-foot rate. Start with the measured surfaces, then compare access, surface testing, protection, runoff, schedule, documentation, assumptions, and exclusions. A project-specific proposal should connect its price to that written scope.

Scope It

Start a gross facade takeoff

Cleaning is priced on the surface being cleaned, not floor area. A quick way to estimate a simple rectangular envelope: building perimeter × height. A final takeoff must adjust for setbacks, towers, recesses, parapets, openings, separate materials, excluded surfaces, and areas requiring another method.

  • Use the same measured elevations and finish standard when comparing bidders
  • Separate routine soiling from oxidation, mineral deposits, damage, and restoration work
  • Require each bidder to state access, controls, documentation, assumptions, and exclusions

Gross facade-area starter

Facade area: —

Math: perimeter × height. This is a gross planning area, not a final takeoff or price — request a project-specific scope.

Access Scope

Compare plans, not method slogans

Each method has different building, safety, site, weather, and operating requirements. Normalize the cleaning scope and finish first, then compare the complete access and control plans that support the price.

Drone-supportedBoom lift / swing stageRope access
Access planFlight, standoff, tether or hose, ground-control, and recovery plan.Equipment selection, delivery, setup, travel path, and work-zone plan.Certified anchorages, rigging, edge protection, fall arrest, and rescue plan.
Site interfaceAirspace, weather, people, vehicles, obstacles, spray drift, and equipment limits.Ground bearing, setbacks, overhead hazards, delivery route, and occupied areas.Roof access, anchor records, drops, stabilization, weather, and area below.
Surface methodProduct and procedure established by manufacturer guidance and a representative test.Same requirement.Same requirement.
Public and tenant controlsDefined from crew, aircraft, hose, spray, controlled-area, and recovery envelope.Defined from equipment, crew, swing radius, travel, and work-zone envelope.Defined from rigging, workers, tools, drops, and work-zone envelope.
Price basisMeasured scope plus the approved flight, cleaning, protection, and documentation plan.Measured scope plus equipment, cleaning, protection, and documentation plan.Measured scope plus rigging, cleaning, protection, rescue, and documentation plan.

By Service

What drives each price

Soft Washing

  • Measured surface zones, geometry, openings, setbacks, and exclusions
  • Substrate, coating, condition, contamination, and test-area findings
  • Selected access method and the flight, hose, roof, and ground-control plan
  • Product, dwell, rinse, landscaping, adjacent-material, drainage, and wastewater controls
  • Work windows, occupants, documentation, finish standard, assumptions, and exclusions
How much does commercial building washing cost?

Pressure Washing

  • Measured surface zones and the type, depth, and source of contamination
  • Substrate strength, existing coatings, joints, damage, and test-area findings
  • Access, traffic, pedestrian, equipment, hose, overspray, and work-zone controls
  • Water supply plus containment, diversion, recovery, treatment, and disposal requirements
  • Separate preparation or coating scopes, documentation, finish standard, and exclusions
How often should you wash a commercial property?

Window Cleaning

  • Glass area, pane count, frames, sills, facade zones, setbacks, and obstructions
  • Glass, coating, gasket, sealant, deposit, defect, and test-area findings
  • Water source, filtration target, rinse method, weather, overspray, and drainage controls
  • Selected access method, public and occupant controls, work windows, and detailing needs
  • Viewing standard, documentation, construction-debris or restoration exclusions
Drone window cleaning vs. rope access: a straight comparison

Graffiti Removal

  • Structure type and substrate: concrete, painted steel, and masonry take different removers
  • Required traffic, pedestrian, site, aviation, hose, and work-zone controls
  • Authorization and response target for a single removal or an approved program
  • Test-area findings, acceptable residual shadow, and any full-panel treatment
  • Wash-water, documentation, finish, restoration, and closeout requirements
The graffiti removal playbook for DOTs and municipalities

Programs

Build a condition-based maintenance plan

There is no universal cleaning interval or guaranteed repeat-service discount. Record condition by surface and elevation, follow manufacturer guidance, and use representative inspections to set triggers. Ask bidders to explain any repeat-work savings through specific scope, mobilization, documentation, or site assumptions.

Managing a portfolio? Use one intake and comparison framework, but require a property-specific surface, access, environmental, operating, and acceptance review for every location.

Writing next year's budget? Use theexterior cleaning budget workbook — measured scope, bid leveling, allowances, condition triggers, and paste-ready planning language.

Why not publish a universal rate card?

Because access, surface, site logistics, controls, and finish requirements can move the number more than square footage alone. A written proposal should state the measured scope, method, assumptions, exclusions, and price.

Is the drone always the cheaper option?

No method is always cheaper. Compare written scopes for the same surfaces, finish, controls, schedule, documentation, assumptions, and exclusions. Site conditions may favor drone-supported, ground, lift, rope, scaffold, or combined access.

How do maintenance programs change the price?

Use inspection history and manufacturer guidance to set condition-based triggers. For repeat work, require each proposal to state what scope, mobilization, documentation, or site knowledge changes the price rather than assuming savings.

Request a project-specific written price

Don't have the address yet? Send your email and we'll follow up for the property details.

Get a project-specific written quote.

Or ask whether a live demonstration is appropriate for your property.